We worked with our client to assess a leak on a 400mm Strategic Water Main running through a farmers field. Once the appropriate contingency plans were put in place, we deployed a two man repair team along with a 26t Beaver Tail with 10t Crane along with our 360 Excavator and Dumper as well as two sections of mains in the event of asset failure.
We arrived on site at 8am, dug down 2.5m and set aside Suitable Excavated Material (SEM) as well as Farm Top soil. We exposed the main and repaired a leak on the collar. We then proceeded to backfill using SEM and the Farm Top Soil we had set aside and had cleared site by 5pm.
Using this approach, we avoided the need to import or export any material.
The work carried out at Wendens Ambo is another example of our complete Turnkey Solution. This continues to demonstrate our commitment to a Circular Economy by reusing all suitable materials and reducing vehicle and plant movements as well as our carbon impact.